How to Install Upvc Windows and Doors
Upvc windows and doors, like other types of building doors and windows, not only play a protective role in housing construction but also ensure various functions and indoor and outdoor decorative effects. No matter how finely crafted the new uPVC windows and doors are in the factory, no matter how good the quality is, no matter how carefully they are handled and stored, only if you are not serious and responsible during installation, just plugging them into the opening will make the quality of the doors and windows go to waste. In this article, we will give you a detailed analysis of the installation process and precautions of uPVC windows.
● upvc dome window
● upvc sliding louvers
● upvc awning windows
● upvc tilt and turn window
● upvc awning windows
1. The distance between the installation feet of doors and windows exceeds the distance specified in the specification. If the corresponding fixing screws are not used according to the wall material, it will cause potential safety hazards. Under the action of a certain wind load or when people go up to wipe the glass, it may occur The tragedy of people's windows falling to the ground at the same time.
2. The gap between the door and window frame and the wall is not filled with elastic material. When the ambient temperature changes, the PVC profile rod will be deformed due to thermal expansion and contraction, and the switch will be blocked or even damaged;
3. If the gap between the upvc doors and windows and the wall is too small, the openings are not trimmed, and the doors and windows are forced into the openings, so that the doors and windows cannot be adjusted horizontally and vertically in the openings, and even when the temperature rises, the doors and windows are squeezed and deformed. Affect.
4. If the lower part of the bottom frame of the door and window is not padded, the bottom frame will be concave under the action of the self-weight of the door and window sash, which will affect the overlap of the door and window sash and the use of the switch, especially the sliding window will cause the hidden danger of falling sash;
5. The horizontality and verticality of the installation of doors and windows exceeds the requirements of the specification, which will cause the deformation of the doors and windows, which will affect the overlap and sealing of the frame and fan, so that the doors and windows cannot be opened and closed;
Note:
1. No. 1-4 are the preparation steps before installation
2. The "+" sign in the table indicates the process that should be carried out
3. "*" in the table indicates optional process.
What should you pay attention to
1. All screws that should be fastened must be tightened during installation to prevent loosening or falling off, affecting the use and safety of doors and windows:
2. If the gap between the door and window frame and the opening of the wall is not filled tightly with Styrofoam, air will enter and water will seep;
3. The last process of installation is to clean and sanitize, and it is also a link that is easily overlooked. After the doors and windows are in place in the hole until the completion of Anyuan, the construction period is relatively long, especially in the cross-operation with the civil construction department, it is difficult to avoid the cement mortar and other building materials in the grooves of the plastic door and window profiles, or pollution. All these pollutants on the surface of PVC profiles, if not cleaned up in time, will be scratched, affecting the opening and closing of doors and windows or even damage;
4. If you don't take the installation quality self-inspection seriously and just go through the motions, you will not be able to find quality problems, you will not be satisfied with users, and you will gain a good social reputation. For example, the quality of the welding seam was not carefully checked during the installation process, and cracked products were installed for the user, which affected the interests and caused the user to be dissatisfied; he did not check whether the drainage holes were unblocked, and the drainage holes had been blocked by cement mortar, and the user did not wait until it rained. The water can’t flow out when I find out; I don’t check whether the installation of the accessories is complete. When the sandstorm comes and the user finds that the house is full of dirt, they know that the windproof block is not installed; , It turned out to be the fault of the cement mortar block, and it was the reason of not careful cleaning after installation.
5. As a building component product, plastic doors and windows must meet the building's physical performance standards and various functional requirements. Although the safety of use has not been proposed separately, the general knowledge of the door and window manufacturing industry knows that doors and windows are in dynamic load and under the action of static load, it should have sufficient strength. As a specific product, doors and windows must not only ensure the function of use but also ensure the safety of use. Safety, the first is determined by the design and manufacturing process, and the second is determined by the installation process, especially the installation, that is, the final check before the product is delivered for use. In the construction of doors and windows, there have been many cases of falling sashes, which have caused a shock to society. We must learn a lesson to ensure the installation quality and safety and reliability.
Chimgreen is one of the plastic window manufacturers in China, and we provide high quality readymade pvc doors. If you want to purchase a special one, we can also customize upvc windows and doors for you.
Types of Plastic Window and Door:
● upvc dome window
● lamination upvc window
● upvc curved window
● upvc folding louvers
● upvc casement louvers
● upvc sliding louvers
● upvc fixed window
● upvc sliding windows
● upvc awning windows
● upvc folding window
● upvc casement windows
● upvc tilt and turn window
● upvc door with tilt and turn window
● upvc sliding doors
● upvc casement doors
● upvc awning windows
If you do not install according to the pvc or upvc door and window installation process specifications, the following consequences will occur:
1. The distance between the installation feet of doors and windows exceeds the distance specified in the specification. If the corresponding fixing screws are not used according to the wall material, it will cause potential safety hazards. Under the action of a certain wind load or when people go up to wipe the glass, it may occur The tragedy of people's windows falling to the ground at the same time.2. The gap between the door and window frame and the wall is not filled with elastic material. When the ambient temperature changes, the PVC profile rod will be deformed due to thermal expansion and contraction, and the switch will be blocked or even damaged;
3. If the gap between the upvc doors and windows and the wall is too small, the openings are not trimmed, and the doors and windows are forced into the openings, so that the doors and windows cannot be adjusted horizontally and vertically in the openings, and even when the temperature rises, the doors and windows are squeezed and deformed. Affect.
4. If the lower part of the bottom frame of the door and window is not padded, the bottom frame will be concave under the action of the self-weight of the door and window sash, which will affect the overlap of the door and window sash and the use of the switch, especially the sliding window will cause the hidden danger of falling sash;
5. The horizontality and verticality of the installation of doors and windows exceeds the requirements of the specification, which will cause the deformation of the doors and windows, which will affect the overlap and sealing of the frame and fan, so that the doors and windows cannot be opened and closed;
How to Install Upvc Windows Uk
Process | Single Window | Combination Door and Window | Ordinary Door |
1 Find the center line at the hole | + | + | + |
2 subsidized protective film | + | + | + |
3 Install the back embed one | - | * | - |
4 Find the midline on the frame | + | + | + |
5 Mounting the attachment frame | * | * | * |
6 Plaster leveling | * | * | * |
7 Remove glass (or door, window sash) | * | * | * |
8 frame inlets | + | + | + |
9 Adjust positioning + | + | + | + |
10 Door and window frame fixing | + | + | + |
11 Cover process hole cap and sealing treatment | + | + | + |
12 packs | - | + | - |
13 dozen urethane foam + + + | + | + | + |
14 Window sills installed * * | * | * | - |
15 Hole plastering + + | + | + | + |
16 Cleaning Mortar + + + | + | + | + |
17 hits of sealant + + | + | + | + |
18 Mounting accessories + + | + | + | + |
19 Glass (or door, window sash) + + + | + | + | + |
20-pack of screen windows (doors) * | * | * | * |
21 Surface cleaning + + | + | + | + |
22 Remove protective film + + | + | + | + |
Note:
1. No. 1-4 are the preparation steps before installation
2. The "+" sign in the table indicates the process that should be carried out
3. "*" in the table indicates optional process.
What should you pay attention to
Therefore, the following points must be paid attention to during installation from Chimgreen- upvc windows and doors company:
1. All screws that should be fastened must be tightened during installation to prevent loosening or falling off, affecting the use and safety of doors and windows:
2. If the gap between the door and window frame and the opening of the wall is not filled tightly with Styrofoam, air will enter and water will seep;
3. The last process of installation is to clean and sanitize, and it is also a link that is easily overlooked. After the doors and windows are in place in the hole until the completion of Anyuan, the construction period is relatively long, especially in the cross-operation with the civil construction department, it is difficult to avoid the cement mortar and other building materials in the grooves of the plastic door and window profiles, or pollution. All these pollutants on the surface of PVC profiles, if not cleaned up in time, will be scratched, affecting the opening and closing of doors and windows or even damage;
4. If you don't take the installation quality self-inspection seriously and just go through the motions, you will not be able to find quality problems, you will not be satisfied with users, and you will gain a good social reputation. For example, the quality of the welding seam was not carefully checked during the installation process, and cracked products were installed for the user, which affected the interests and caused the user to be dissatisfied; he did not check whether the drainage holes were unblocked, and the drainage holes had been blocked by cement mortar, and the user did not wait until it rained. The water can’t flow out when I find out; I don’t check whether the installation of the accessories is complete. When the sandstorm comes and the user finds that the house is full of dirt, they know that the windproof block is not installed; , It turned out to be the fault of the cement mortar block, and it was the reason of not careful cleaning after installation.
5. As a building component product, plastic doors and windows must meet the building's physical performance standards and various functional requirements. Although the safety of use has not been proposed separately, the general knowledge of the door and window manufacturing industry knows that doors and windows are in dynamic load and under the action of static load, it should have sufficient strength. As a specific product, doors and windows must not only ensure the function of use but also ensure the safety of use. Safety, the first is determined by the design and manufacturing process, and the second is determined by the installation process, especially the installation, that is, the final check before the product is delivered for use. In the construction of doors and windows, there have been many cases of falling sashes, which have caused a shock to society. We must learn a lesson to ensure the installation quality and safety and reliability.